EPC y Construccion

Proyecto y referencia

Loke StartLiving Group a construí, ta construí y ta prepará — cu e materialnan cu nos a suministrá for di nos mes trading desk.

0
Proyecto
0
Pais
0
Tonelada suministrá
Coastal road upgrade, Aruba Na progreso
Caminda · 🇦🇼 San Nicolas, Aruba · 2025

Coastal road upgrade, Aruba

6.4 km two-lane coastal road rehabilitation: base course, PMB asphalt wearing course, drainage and lighting.

Material suministrá
Bitumen 60/70 Penetration Grade · 2.600 MTPortland Cement CEM I 42.5 R · 600 MT
Mira proyecto →
Industrial water network, Dubai Na progreso
Infraestructura · 🇦🇪 Dubai, United Arab Emirates · 2025

Industrial water network, Dubai

Design-build of 9 km process-water and fire-main network for an industrial park, incl. pump stations and SCADA.

Material suministrá
Portland Cement CEM I 42.5 R · 1.100 MTRebar B500B (EN 10080 / DIN 488) · 220 MT
Mira proyecto →
Logistics hub, Istanbul Completá
Industrial · 🇹🇷 Istanbul, Türkiye · 2024

Logistics hub, Istanbul

Turn-key 12,000 m² cross-dock warehouse with office wing, yard paving and utilities — EPC from permit to handover.

Material suministrá
Portland Cement CEM I 42.5 R · 3.400 MTRebar B500B (EN 10080 / DIN 488) · 1.200 MTHot Rolled Coil (HRC) · 900 MT
Mira proyecto →
Residential complex renovation, Rüsselsheim Completá
Renovacion · 🇩🇪 Rüsselsheim, Germany · 2023

Residential complex renovation, Rüsselsheim

Energy-efficient refurbishment of a 48-unit residential complex: façade insulation, roofing, windows and complete M&E renewal.

Material suministrá
Portland Cement CEM I 42.5 R · 420 MTRebar B500B (EN 10080 / DIN 488) · 180 MT
Mira proyecto →
Road bridge rehabilitation, Rhine-Main Completá
Brug · 🇩🇪 Frankfurt, Germany · 2022

Road bridge rehabilitation, Rhine-Main

Deck replacement and bearing renewal on a 140 m road bridge under live traffic; night-shift pours and phased lane closures.

Material suministrá
Portland Cement CEM I 42.5 R · 950 MTRebar B500B (EN 10080 / DIN 488) · 310 MT
Mira proyecto →
22-storey mixed-use tower, Lagos Planificá
Edificio halto · 🇳🇬 Lagos, Nigeria · 2026

22-storey mixed-use tower, Lagos

Structural shell and core for a 22-storey residential/commercial tower; procurement of rebar, cement and curtain-wall from StartLiving supply chain.

Material suministrá
Portland Cement CEM I 42.5 R · 9.000 MTRebar B500B (EN 10080 / DIN 488) · 4.800 MTHot Rolled Coil (HRC) · 2.200 MT
Mira proyecto →

Oficina y partner

Pais: 5

Loke StartLiving Group a construí, ta construí y ta prepará — cu e materialnan cu nos a suministrá for di nos mes trading desk.

Discutí bo proyecto